★★★★★
ASIC Hardware Diagnostics & Repair Masterclass
"Saved over 30 S19 hashboards from the scrap pile"

Before attending the Seaton workshop, our approach to failed hashboards was basically swapping entire machines and shipping bad boards overseas for 3-month turnaround times. Learning how to trace domain voltages and replace individual dead ASIC chips using their hot-air preheater setup changed our whole operational workflow. We diagnosed and repaired 34 boards in our first month back on-site.

Extended Case Detail:

Darren brought four non-responsive S19j Pro boards to the lab. Under the guidance of our lead engineer, two were diagnosed with failed 1.8V LDO regulators and repaired during the morning session. The other two had shorted domain silicon, which Darren successfully desoldered and replaced using our BGA rework stencils on day two.

Darren McCubbin Farm Maintenance Manager, Gippsland Compute Services Traralgon, VIC • May 2026
★★★★
Solar-Powered Mining & Grid Curtailment Strategy
"Practical solar script integration, though the networking section moved fast"

Our 100 kW shed solar system was getting throttled by Essential Energy almost every sunny afternoon. The workshop gave us the exact Python Modbus script and hardware specs to ramp miner loads up and down automatically. My only reservation was that the Linux network interface setup on the afternoon of day one moved very fast for someone without a coding background, but the follow-up field manual notes covered the gaps.

Sarah Lin Agricultural Property Owner & Solar Operator, Murrumbidgee Agri-Energy Griffith, NSW • April 2026
★★★★★
Immersion Cooling & Dielectric Fluid Systems Course
"Clean dielectric fluid thermodynamics without marketing hype"

Most online guides about immersion cooling are sponsored by fluid manufacturers. Smart Work Point showed the raw numbers: pump head loss, heat exchanger fouling factors, and how synthetic fluid actually reacts with stock cable insulation over 12 months. Building out a working single-tank test bench in the workshop gave me the confidence to construct our own 12-rig closed loop.

Extended Case Detail:

Peter converted a custom 8-miner insulated tank using a brazed plate heat exchanger and external dry cooler. His facility acoustic level dropped from 82 dBA to under 42 dBA, allowing continuous operation in a shared rural commercial shed.

Peter Vandermeer Independent Mining Operator, Highland Hash Lab Ballarat, VIC • February 2026
★★★★★
Mining Facility Electrical & Thermal Feasibility Audit
"Thorough thermal imaging and cable derating analysis"

I was hired by a client to commission a 250 kVA sub-board for a modular mining container. Bringing Smart Work Point in for the thermal and harmonic audit identified that the client's planned intake ducting would have choked the rear exhaust fans by 40%. Their calculation of the required static pressure saved my client tens of thousands in premature fan motor burnouts.

Craig Henderson Electrical Contractor, Henderson Electrics Sale, VIC • June 2026
★★★★★
Mining Farm Operations & Fleet Maintenance Bootcamp
"Invaluable ultrasonic cleaning and desiccation practice"

The 5-day bootcamp is intense and deeply practical. There were no abstract slide decks—we spent five straight days stripping down dirty rigs, operating the heated ultrasonic wash tanks, testing high-amperage C19 cables, and configuring Stratum proxies under simulated network packet loss.

Extended Case Detail:

Elena joined Southern Compute Group as a junior facility technician following the bootcamp, successfully managing a 400-miner deployment in central Victoria.

Elena Rostova Data Centre Technician, Southern Compute Group Melbourne, VIC • July 2026
In-Depth Case Study

Remediating a 45°C Thermal Stalling Issue in the Riverina

How an agricultural operator eliminated emergency shutdown trips during January heatwaves.

The Initial Constraint

An almond processing property in regional NSW operated a 75-miner cluster behind their 150 kW rooftop solar array. During December and January, intake air temperatures inside the shed reached 46°C, causing miner fan RPM to hit 7,000 RPM and triggering thermal trip-offs across 60% of the fleet.

The Workshop Engineering Approach

The operator attended our 1-Day Solar Curtailment Strategy workshop and commissioned an On-Site Thermal Audit. We recalculated the shed static pressure, redesigned the intake louvre sizing from 4 m² to 11 m² using washable G3 pleated media, and deployed a positive-pressure exhaust wall.

The Measured Outcome

Static pressure dropped from -85 Pa down to -15 Pa. Intake temperatures were lowered by 7.5°C using an automated evaporative wet-pad cycle, and miner fan speeds stabilized at 4,800 RPM. Fleet uptime increased from 68% to 99.4% through the peak summer operating period.

Key Takeaway:

Airflow resistance, not sheer machine horsepower, is the primary limiting factor in Australian regional mining installations.

Experience Practical Bench Training in Seaton

Join an upcoming intake or speak with our engineers about assessing your facility.

Submit Workshop Inquiry